Weishi County Zhuqu Town street low-pressure overhead line into the ground pipeline project and Sanzi Huanghu Party members and mass activity site construction project - Results announcement

Release time: 2024-02-06 11:20:26 Number of page views: Author: Kaifeng Public resources trading information Network

Weishi County Zhuqu Town street low-pressure overhead line into the ground pipeline project and three characters yellow Lake party members and mass activity site construction project-Result announcement

 

Henan Road Project Management Co., Ltd. was entrusted by Weishi County Jincai Investment Group Co., LTD., on the Weishi County Zhuqu Town street low-pressure overhead line into the ground pipeline project and the construction project of Sanzi Huanghu Party members and mass activities, in20240201Bid opening and evaluation activities were conducted on the third floor of Weishi County Public Resources Trading Center in accordance with the law。After the expiration of the publicity period for the candidates, the bidding committee shall, in accordance with the bidding principles, methods and procedures,20240206HijaweiThe calibration room of the county public resources trading Center was calibrated by the verification and extraction method。The bidding results are now announced as follows:

1. Description of the bidding project

1.1 Project name: Weishi County Zhuqu Town street middle and low pressure overhead line into the ground pipeline project and three characters Huanghu Party members and mass activity site construction project

1.2 Project Number:JSGCGK-2024-003

1.3 Estimated contract price: approx1260万元

1.4 Project scale: Medium and low pressure overhead line into the ground pipeline project: new three-way well16Check the well21The length of the new pipe row path is about 121300m, create a new pipe jacking and piping path about2000mAnd equipment basis。Weak current into the ground pipeline project: new inspection well37,About creating a pipe row path20000m。The abandoned buildings in Huanghu Village were transformed into places for party members and mass activities, with an area of about600㎡, including party members activity room, elderly activity center, volunteer service station, convenience service center, library, archive room, toilet, etc。Sanzi Village new party members and mass activities area of about500㎡, including party members activity room, elderly activity center, volunteer service station, convenience service center, library, archive room, toilet, etc。  

1.5Scope of tender:

The first and second bidding sections: This bidding section adopts the general contracting mode (EPC), including but not limited to the design, procurement, construction and warranty services within the scope of the project and all the contents specified in the bidding documents。

The third bidding section: the supervision services of the construction stage and the engineering defect liability stage of the first and second bidding sections。

1.6Determining the winning bidder: This project adopts the evaluation separation method to determine the winning bidder

Ii. Division of bid sections

2.1The project is divided into three sections

The first section: Weishi County Zhuqu Town street low pressure overhead line into the ground pipeline project

The second section: Weishi County three characters Yellow Lake party members and mass activity site construction project

The third section: Weishi County Zhuqu Town street low-pressure overhead line into the ground pipeline project and three characters Huanghu party members and mass activity site construction project supervision

2.2Construction period requirements:

Period of the first and second bidding sections:2个月

The term of supervision service of the third bidding section: with the construction period and the defect liability period

2.3Quality requirements:

The first and second bidding sections: the design quality meets the requirements of the relevant national, provincial, municipal, district and other relevant design technical standards, norms and industry current standards;The construction quality has reached the qualified standards of the relevant national, provincial, municipal, district and other relevant departments of the construction quality acceptance code。

Section 3: Qualified, the quality standards of construction supervision shall meet the relevant requirements of the national standard "Code for Construction Supervision"。2.4The bidding control price of each section of the project is:

The first and second bidding sections: the bidding control price of the construction and installation fee of the project: the settlement and audit of the construction and installation fee of the project100%

Project design fee bidding control price: project construction and installation fee settlement audit1.5%

The third bidding section: the settlement of construction and installation fees of the project1.5%

三、Bid opening time:20242110:00

Bid evaluation time:20242110:10

Calibration time:20242609:30

Iv. Bid evaluation

Bid evaluation committee members: Guo Yongfang, Fan Shiming, perennial Qing, Jin Rongzhi, Fu Xiuyu

List of members of bidding committee: Wang Baoqin, Han Xiaoli, Hu Chuanyin

五、Check the situation

The first bidding section is approved by the list2Home: Henan Dingfan Construction Engineering Co., LTD., Henan Zhongdaxiang Construction Engineering Co., LTD.Failed list and reasons: Henan Guanghui Construction Engineering Co., Ltd. in the tender documents of the design person registration certificate does not meet the requirements of the tender documents,Expiration of the use period;The experimental inspection scheme in the construction organization design of the bidding documents of Henan Shuihang Construction Engineering Co., Ltd. does not meet the requirements of the bidding documents,The above twoIf the verification fails, the calibration procedure will not be entered。

The second bidding section is approved by the list2Home: Henan Tailian Construction Engineering Co., LTD., Henan Chijin Construction Engineering Co., LTD.Failed to pass the list and reasons: Zhongding Changsheng Construction Group Co., LTD. Bidding documents construction organization design of the construction period guarantee measures do not meet the requirements of the bidding documentsIf the verification fails, the calibration procedure will not be entered。

The third bid section passed the list altogether4Home: Henan Hao Zhiwei construction project management Co., LTD., Henan Zitai Engineering Consulting Co., LTD., Henan City Investment Project Management Co., LTD., Minyao Engineering Consulting Co., LTD.Failed list and reasons: The bid documents of Kaida Engineering Consulting Co., Ltd. do not conform to the bidding documents7.6.1There is no commitment;The rationalization proposal of the construction unit in the bidding document of Jiangsu Yutian Engineering Consulting Group Co., Ltd. does not meet the requirements of the project, and the performance does not meet the requirements;The tender documents of Zhongji Engineering Technology Co., Ltd. do not conform to the tender documents7.7.1The requirements, no related commitments, above threeHome verification does not pass, do not enter the calibration procedure。

6. Information about the successful candidates

Section 1:

The full name of the leader of the winning unit: Henan Dingfan Construction Engineering Co., LTD

Consortium member: Zhongye Engineering Construction Group Co., LTD

Tender offer:

Project construction and installation fee: project construction and installation fee settlement audit 99.2%

Project design fee: project construction and installation fee settlement audit 1.3%

Qualifications: Response to tender documents       工期:2个月。

Quality: The design quality meets the requirements of national, provincial, municipal, district and other relevant departments related to design technical standards, norms and industry current standards;The construction quality has reached the qualified standards of the relevant national, provincial, municipal, district and other relevant departments of the construction quality acceptance code。

Project Manager: Chen Zongliang        Certificate name: Builder Certificate        Registration number: Yu 241151581394                                   Design Director: Lu Yongchao       Certificate Name: Architect Certificate        Certificate Number:20214101487

Section 2:

The full name of the leader of the winning unit: Henan Tailian Construction Engineering Co., LTD

Consortium member: Guangzhou Bosha Architectural Design and Research Institute Co., LTD

Tender offer:

Project construction and installation fee: project construction and installation fee settlement audit98%

Project design fee: project construction and installation fee settlement audit 1.2%

Qualifications: Response to tender documents       工期:2个月。

Quality: The design quality meets the requirements of national, provincial, municipal, district and other relevant departments related to design technical standards, norms and industry current standards;The construction quality has reached the qualified standards of the relevant national, provincial, municipal, district and other relevant departments of the construction quality acceptance code。

Project Manager: Wei Jie         Certificate name: Builder Certificate        Registration number: Yu241202197460                                   Design Leader: Hara Shubin     Certificate Name: Architect Certificate        Certificate Number:20164101004

Section 3:

The full name of the winning bidder: Henan Hao Zhiwei Construction Engineering Management Co., LTD

Tender offer: the settlement of construction and installation costs of the project1.41%            Qualifications: Response to tender documents    

Supervision service period: with the construction period and defect liability period     

Quality requirements: Qualified, construction supervision quality standards must meet the relevant requirements of the national standard "Construction project Supervision Code"。

Project Director: Wu Xiaohua         Certificate Name:Registered supervision engineer     Certificate Number:00240181     

7. Publishing media

This announcement is published on the "China Tendering and Bidding Public Service Platform" and "Kaifeng Public Resources Trading Center Network"。

8. Contact information

Tenderer: Weishi County Jincai Investment Group Co., LTD

    Address: Weishi County city Weizhou Avenue middle

Contact: Ms. Wang

Contact number:0371-27965688

Agency: Henan Daoben Project Management Co., LTD 

    Address: Zhengdong New District business inner ring road9Building number Longhu Building1109     

Contact: Ms. Zhu

Contact information:13723252995

Supervision unit: Weishi County construction project bidding Office

Contact number:0371-227126880371-27990065

 

 

 

 




Download attachment:Announcement of Results (1)
                 

All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1

Technical support:Zhengzhou Xinyuan Information Technology Co., LTD